Pushed into poverty
5.5 crore
Indians made poor by medical bills in 2017. 1
Today we run camps and drives with volunteers. This page sets out what we want to build next, in order: a 100-bed hospital, a medical bus with its own ICU, a shav vahan, a kitchen serving meals for ₹1 to ₹5, a study centre and a shelter. The first four have full details and a line-by-line budget.
The totals add up the figures in the six plans below. Where a plan gives a range, both ends are added.
One card on each project: what it is, what it costs to start and what it costs each year.
A 100-bed hospital built to the government standard, with a 24-hour emergency, operation theatres and a wing for mothers and newborns. The poorest pay nothing.
A full-size bus with a doctor's room, a lab, X-ray, ultrasound, drip beds and a two-bed ICU. It visits a different basti each day, and everything is free.
A hearse with a built-in cold cabinet, available day and night. Free for families who cannot pay, and for unclaimed bodies.
A kitchen open every day, serving a full, filling meal for ₹1 to ₹5. No card, no ID, no questions.
Catch-up classes for children who are not in school, and for those who are in school but cannot yet read.
A home with 30 places, for elderly people left on their own and for women who had to leave home to be safe.
Each bar is one project, longest first. The hospital is by far the biggest, so the other five look small here, but each one still needs its full amount. Where a plan gives a range, the bar shows the higher figure.
Each project answers a problem that has already been measured. These four numbers show how big it is.
Pushed into poverty
5.5 crore
Indians made poor by medical bills in 2017. 1
Specialists missing
8 in 10
Specialist doctors that rural health centres need but did not have, March 2023. 4
Short of protein
73 in 100
Indians surveyed in 2017 who were not getting enough protein. 6
Children out of school
4.6 crore
Aged 6 to 17, estimated from UDISE+ 2024-25 data. 8
You can check every number on this page. The small numbered links go to the list of sources at the bottom.
“Recall the face of the poorest and the weakest man whom you may have seen, and ask yourself, if the step you contemplate is going to be of any use to him.”
पूरा इलाज, पैसा उतना जितना आप दे सकेंThis is the most important thing on our list and the biggest. A full 100-bed hospital built to the government's own standard for a district hospital: a 24-hour emergency, beds for very ill patients who need close watching, three operation theatres, a wing for mothers and newborns, dialysis, a lab, X-ray and ultrasound. What a family pays will depend on what it earns. The poorest families will pay nothing.
Start with the whole plot, then pick a floor and a room. You can see it as a flat drawing or as a 3D model, zoom in, and run a fire drill to see how everyone gets out safely.
Project 01 · Our own hospital
The problem this project answers, in numbers that other people have measured and published.
5.5 crore
Indians were pushed into poverty by medical bills in 2017. For 3.8 crore of them, the cost of medicines alone was enough (PHFI study). 1
₹39 of every ₹100
spent on health care in India in 2021-22 came straight out of families' own pockets (National Health Accounts). 2
1 in 6 households
faced a medical bill large enough to count as a financial disaster. In villages, ₹68 of every ₹100 spent on treatment is paid by the family. 3
What will happen, point by point, once it opens.
Everything this plan needs, part by part. The first part is always what the government’s own rules say. Pick a part to read it.
Indian Public Health Standards (IPHS) 2022 for a 100-bed district hospital
What the UP building rules allow, and what the building code asks for
Following the IPHS rule that emergency and OPD go on the ground floor
National Building Code of India 2016, Part 4, for a hospital 15 to 24 metres tall
About 276 people, the total IPHS 2022 gives for a 100-bed district hospital. How they split across the six groups below is our own plan within that total.
All required by law
What each part costs. We have used the highest market prices, so the real cost should not be more.
Line by line, at the top of the market
Total, not counting land₹80 crore
| What it pays for | Share | Amount |
|---|---|---|
| Building structure60,000 square feet at about ₹2,800 a square foot, earthquake-resistant, including the basement and waterproofing | 21% | ₹16.8 crore |
| Building servicesClean-air systems for the theatres and ICU, wiring and panels, plumbing, sprinklers and fire alarms, at about ₹2,200 a square foot | 17% | ₹13.2 crore |
| Hospital finishes and furnitureEasy-to-clean floors and walls, doors, nurses' stations, ward furniture and signs, at about ₹1,000 a square foot | 8% | ₹6 crore |
| Medical equipmentEverything IPHS lists for a 100-bed hospital: X-ray, ultrasound, 3 theatres, HDU, newborn units, lab, dialysis and sterilising. Plus a CT scan, which IPHS calls good to have | 28% | ₹22 crore |
| Oxygen plant and pipelinesA plant big enough for the IPHS peak need (about 1,000 litres a minute), a liquid oxygen tank as back-up, and pipes to every bed | 3% | ₹2.5 crore |
| Power2 generators, the transformer, UPS and 100 kW of solar | 3% | ₹2.5 crore |
| Lifts2 bed lifts, 1 passenger lift, and 1 fire and service lift | 2% | ₹1.6 crore |
| Water, sewage and wastePlants that clean the waste water, RO drinking water and the medical waste room | 1% | ₹80 lakh |
| Computers, software and CCTV | under 1% | ₹60 lakh |
| Two ambulancesOne advanced life support ambulance with a ventilator, and one basic | under 1% | ₹55 lakh |
| Architect, consultants, approvals and licencesDesign and planning fees, and every fee and NOC listed above | 3% | ₹2.5 crore |
| Before the first patientHiring and training, three months of salaries before opening, and the first stock of medicines and supplies | 5% | ₹4 crore |
| Extra 10% for price risesBuilding costs almost always go up while work is going on | 9% | ₹7.3 crore |
| Total, not counting land | ₹80 crore |
We have used the top of the market on purpose. Hospital planners put a 100-bed hospital at ₹30–60 crore. Ours is higher because it includes a CT scan, dialysis, its own oxygen plant and an extra 10% for price rises. 13
Salaries are more than half the cost
Total for one year₹36 crore
| What it pays for | Share | Amount |
|---|---|---|
| SalariesAbout 276 staff as IPHS lists, plus about 20 guards and drivers. Specialists about ₹2.5 lakh a month, medical officers ₹1.1 lakh, nurses ₹38,000, technicians and office staff ₹30,000, support staff ₹18,000 | 57% | ₹20.4 crore |
| Medicines, implants and suppliesMuch of this is given free, or at cost, to families who cannot pay | 25% | ₹9 crore |
| Electricity and dieselThe building runs 24 hours with theatres, an ICU and central air | 6% | ₹2 crore |
| Maintenance contracts for equipmentAbout 8% of the equipment cost each year | 5% | ₹1.8 crore |
| Oxygen, gases and lab chemicalsRunning our own oxygen plant on mains power and refilling the back-up cylinders, for the oxygen patients actually use. The 13.5 lakh litres a day above is what IPHS sizes the pipes for if every oxygen bed ran at full flow all day, which does not happen. Run on the generators, oxygen would cost several times more, so the plant comes off mains power first. | 4% | ₹1.5 crore |
| Patient meals, laundry, cleaning and waste disposal | 3% | ₹1.2 crore |
| Insurance, licence renewals, audit and software | 1% | ₹50 lakh |
| Total for one year | ₹36 crore |
Ayushman Bharat claims and patients who can pay will cover part of this. We will only know how much once the hospital is running, so we plan as if donations must cover the whole first year.
The costs in short, and what a gift of each size pays for.
To build, equip and open it
₹55–80 crore
For 100 beds and about 60,000 square feet, with dialysis, an oxygen plant and a CT scan.
Land, if we have to buy it
₹11–42 crore
Land in and around Ghaziabad sells for about ₹3,500–13,000 a square foot (source 20). At that rate, the 3,600 gaz needed for 100 beds costs ₹11–42 crore. If land is donated or leased to us long-term, this cost goes away.
To run it for one year
₹36 crore
About 296 people in three shifts. Salaries are more than half. Medicines, electricity, oxygen and maintenance make up the rest.
इलाज, आपकी गली तकThis will be a full-size bus of 11–12 metres, not a van. It will have a doctor's room at the front, a lab and an X-ray and ultrasound room in the middle, and two drip beds and a two-bed ICU with ventilators at the back. It will visit each basti on a fixed day every week. If a patient is too ill to be treated there, the ICU on board keeps them stable on the way to hospital.

Seven rooms, from the driver at the front to the ICU at the back. See it as a flat drawing or as a 3D model in our colours, open it up, and pick a room to read what happens there.
Project 02 · Medical bus
The problem this project answers, in numbers that other people have measured and published.
8 out of 10
specialist doctors that rural health centres (CHCs) need were missing in March 2023: 17,551 short of the 21,964 required. 4
83 in 100
surgeon posts at rural health centres were empty in March 2023. For gynaecologists the figure was 74 in 100, and for children's doctors 67 in 100. 4
1 bus for 10 lakh people
is the National Health Mission's norm for mobile medical units, with no more than 5 per district. 5
What will happen, point by point, once it opens.
Everything this plan needs, part by part. The first part is always what the government’s own rules say. Pick a part to read it.
National Health Mission (NHM) guidelines for Mobile Medical Units
Built to the government ambulance standard AIS-125, Type D
Chassis and body builder
Before the first patient
What each part costs. We have used the highest market prices, so the real cost should not be more.
Line by line, at the top of the market
Total₹2.45 crore
| What it pays for | Share | Amount |
|---|---|---|
| Base vehicle (chassis)An 11–12 metre bus base, on the road with taxes | 16% | ₹40 lakh |
| Body and medical interiorInsulated medical body, raised roof, lead-lined X-ray cabin, wheelchair lift and awning | 18% | ₹45 lakh |
| PowerGenerator, UPS, solar panels and wiring | 4% | ₹10 lakh |
| ICU and drip beds2 ICU ventilators at up to ₹15 lakh each, 4 monitors, a defibrillator, pumps, suction and 4 beds 16 | 24% | ₹58 lakh |
| X-ray and ultrasoundPortable digital X-ray (about ₹25 lakh) and colour Doppler ultrasound (about ₹20 lakh) | 18% | ₹45 lakh |
| LabTest machines, a blood cell counter, a sample spinner (centrifuge), a fridge and the first stock of test kits | 5% | ₹12 lakh |
| Oxygen, air conditioning, water and medicine store | 3% | ₹8 lakh |
| Registration, insurance and licences | 2% | ₹5 lakh |
| Extra 10% for price rises | 9% | ₹22 lakh |
| Total | ₹2.45 crore |
Without the X-ray and ultrasound, the same bus costs about ₹2 crore. Karnataka's state transport corporation built a five-bed ICU bus in its own workshop for about ₹10 lakh. We will be buying a new bus and paying a body builder, so our cost is much higher. 25
About 300 working days
Total for one year₹80 lakh
| What it pays for | Share | Amount |
|---|---|---|
| SalariesThe seven staff listed above | 45% | ₹36 lakh |
| Medicines and test kitsAbout 90 visits a day at about ₹100 each | 34% | ₹27 lakh |
| DieselFor driving, and for running the generator 6 hours a day | 12% | ₹9.5 lakh |
| Repairs, tyres, insurance and equipment maintenance | 10% | ₹8 lakh |
| Total for one year | ₹80 lakh |
The costs in short, and what a gift of each size pays for.
The bus, fully fitted
₹2–2.45 crore
A full-size bus with a doctor's room, lab, drip beds, a two-bed ICU and a generator. The higher figure includes X-ray and ultrasound.
To run it for one year
₹80 lakh
The National Health Mission approves ₹18.6 lakh a year for a one-vehicle mobile medical unit with five staff, and ₹24 lakh with a diagnostic van. Ours has seven staff, an ICU, X-ray and free medicines, so it costs more.
One day of the bus
₹27,000
Staff, diesel, tests and medicines for one day in one basti. This is the yearly cost divided by about 300 working days.
अंतिम यात्रा, सम्मान के साथWhen someone dies, the family often has to pay ₹8,000–15,000 for a hearse within the city, and much more for a longer journey. For a poor family this comes at the worst possible time. Our shav vahan will be available 24 hours a day and free for families who cannot pay. It will also carry unclaimed bodies, with police permission, for a proper last rite.

The driver’s cab, six seats for the family and the cold cabinet behind a glass partition. See it as a flat drawing or as a 3D model, open it up, and pick a part to read what it is for.
Project 03 · Shav vahan (hearse)
The problem this project answers, in numbers that other people have measured and published.
₹8,000–15,000
is what a private hearse typically charges for one trip within a city or up to about 100 km. A cooled van for a long journey can cost ₹20,000–50,000 or more. 17
₹1,000–5,000
is the typical charge for even a basic van from a hospital mortuary to a home in the same city. 17
2,178
unidentified bodies were found in Delhi in 2021, according to Delhi Police data. In 2018 the number was 2,991, and only 331 were ever identified. 18
What will happen, point by point, once it opens.
Everything this plan needs, part by part. The first part is always what the government’s own rules say. Pick a part to read it.
There is no national standard for a hearse
Company, model and price
What the family will see
Six people, in turns round the clock
What each part costs. We have used the highest market prices, so the real cost should not be more.
Line by line
Total₹37 lakh
| What it pays for | Share | Amount |
|---|---|---|
| The hearseForce Traveller with a cold cabinet, fully built | 76% | ₹28 lakh |
| Two portable cold boxesAt ₹1.2 lakh each | 6% | ₹2.4 lakh |
| Registration, first-year insurance, permit and painting | 7% | ₹2.5 lakh |
| Helpline phone, GPS and kit | 1% | ₹50,000 |
| Extra 10% for price rises | 9% | ₹3.3 lakh |
| Total | ₹37 lakh |
About 1,000 trips
Total for one year₹30 lakh
| What it pays for | Share | Amount |
|---|---|---|
| Salaries3 drivers at about ₹25,000 and 3 helpers at about ₹18,000 a month | 52% | ₹15.5 lakh |
| Last rites for unclaimed bodiesAbout 100 a year at up to ₹8,000 each | 27% | ₹8 lakh |
| DieselAbout 90 km a day | 10% | ₹3 lakh |
| Repairs, tyres and insurance | 7% | ₹2 lakh |
| Body bags, cloth, disinfectant and helpline | 5% | ₹1.5 lakh |
| Total for one year | ₹30 lakh |
The costs in short, and what a gift of each size pays for.
The vehicle, fully fitted
₹31–37 lakh
A Force Traveller hearse with a cold cabinet, two portable cold boxes, registration and an extra 10% for price rises. The lower figure is for the ₹23 lakh hearse.
To run it for one year
₹30 lakh
Six staff covering 24 hours in turns, diesel, maintenance, and full last rites for about 100 unclaimed bodies a year.
One trip
₹3,000
The yearly cost divided by about 1,000 trips. The family pays nothing.
भरपेट खाना, एक रुपये मेंA bhandara feeds people on a festival day and then stops. This kitchen will be open every day at fixed hours. Each plate will have dal, soya, chana, egg or paneer with roti or rice, at a price low enough that no one has to choose between a meal and the bus fare home.
The token counter, the hand-wash, 60 seats, the serving counter and the kitchen behind it, room by room. See it as a flat drawing or as a 3D model, follow the way a diner goes through it, and pick a room to read who works there.
Project 04 · Community kitchen
The problem this project answers, in numbers that other people have measured and published.
73 in 100
Indians surveyed in 2017 were not getting enough protein, and more than 90 in 100 did not know how much protein they needed each day. 6
2 in 3 children
under five, and more than half of all women, have anaemia (NFHS-5, 2019–21). 7
More than 1 in 3
children under five in India are too short for their age, and about 1 in 5 is too thin for their height (NFHS-5, 2019–21). 7
What will happen, point by point, once it opens.
Everything this plan needs, part by part. The first part is always what the government’s own rules say. Pick a part to read it.
FSSAI, ICMR-NIN, and the state-run ₹5 and ₹8 kitchens
Close to the government kitchens, with more protein
For 500 plates a day
What each part costs. We have used the highest market prices, so the real cost should not be more.
Line by line, at the top of the market
Total₹80 lakh
| What it pays for | Share | Amount |
|---|---|---|
| Steam cooking system and boiler | 13% | ₹10 lakh |
| Automatic roti machineAbout 1,000 rotis an hour | 13% | ₹10 lakh |
| Bulk cookers, range, kneader, cutter and grinder | 10% | ₹8 lakh |
| Cold room, freezer, RO plant and water cooler | 10% | ₹8 lakh |
| Dishwasher, utensils, steel plates and glasses | 8% | ₹6 lakh |
| Exhaust, kitchen fire system, gas pipeline and CCTV | 8% | ₹6 lakh |
| Fitting out the hallTiles, drains, seating, lights and fans | 19% | ₹15 lakh |
| Rent deposit | 8% | ₹6 lakh |
| Licences and the first stock of rations | 5% | ₹4 lakh |
| Extra 10% for price rises | 9% | ₹7.3 lakh |
| Total | ₹80 lakh |
500 plates a day for 365 days, about 1.8 lakh plates
Total for one year₹83 lakh
| What it pays for | Share | Amount |
|---|---|---|
| Raw foodAtta, rice, dal, vegetables, oil, spices and protein, about ₹26 a plate | 57% | ₹47.5 lakh |
| Salaries10 people at about ₹16,000 a month on average | 23% | ₹19.2 lakh |
| RentAbout ₹1.05 lakh a month | 15% | ₹12.6 lakh |
| Gas and electricity | 9% | ₹7.3 lakh |
| Cleaning, water tests and repairs | 4% | ₹3.7 lakh |
| Less what diners payAbout ₹4 a plate on average | taken off | − ₹7.3 lakh |
| Total for one year | ₹83 lakh |
Each plate costs about ₹50 to make, and we pay about ₹46 of that. For comparison, a Shri Annapurna Rasoi plate in Rajasthan costs ₹30 (₹22 from the state government and ₹8 from the diner). Our plate costs more because it has more protein and we have to pay rent.
The costs in short, and what a gift of each size pays for.
To set it up
₹80 lakh
Large kitchen equipment, a cold room, RO water, exhaust and fire safety, seating for 60, the food licence, and fitting out a rented hall.
What each plate costs
₹50
Food ₹26, staff ₹11, rent ₹7, gas and electricity ₹4, cleaning ₹2. The diner pays ₹1–5 and we pay the rest, about ₹46.
To run it for one year
₹83 lakh
500 plates a day, every day of the year, with ten staff, rent, gas and electricity, after what diners pay.
हर बच्चे को पढ़ने का हक़A centre in the neighbourhood for two groups of children: those who are not in school, and those who go to school but still cannot read their textbooks. Classes will be small, the teachers will be paid and will live nearby, and every child will take a reading test every few months. We will publish the results.
The problem this project answers, in numbers that other people have measured and published.
4.6 crore
children in India aged 6 to 17 are not in school. That is about 17 in every 100 children of that age (estimate from UDISE+ 2024-25 data). 8
23 in 100
children in Class 3 could read a Class 2 textbook in 2024, up from 16 in 100 in 2022 (ASER 2024). 9
Fewer than half
of Class 5 children in government schools could read a Class 2 textbook in 2024: 45 in 100 (ASER 2024). 9
“The State shall provide free and compulsory education to all children of the age of six to fourteen years in such manner as the State may, by law, determine.”
What will happen, point by point, once it opens.
The costs in short, and what a gift of each size pays for.
To set it up
₹10–15 lakh
Rent deposit, repairs, furniture, fans and lights, a few computers, books, learning material and teacher training. Our own estimate for one centre with 120 children.
Per child, per year
₹15,000–20,000
This includes proper teacher salaries and a hot meal on every class day. Our own estimate.
To run it for one year
₹18–24 lakh
120 children in a morning and an evening batch, with two paid teachers, one centre manager, rent, electricity and about 250 days of meals.
बुज़ुर्गों और महिलाओं के लिए एक घरA night shelter is a place to sleep for one night. This will be a proper home with 30 places: half for elderly people whose families no longer care for them, and half for women who had to leave home to stay safe. It will provide a bed, food and medical care, and for the women, legal help and job training.
The problem this project answers, in numbers that other people have measured and published.
34.7 crore
Indians will be aged 60 or above by 2050, about 1 in every 5 people. In 2022 the number was 14.9 crore (UNFPA India Ageing Report 2023). 10
45 in 100
older people in one community study had faced abuse. A 2018 HelpAge India survey found disrespect in 56 in 100 cases, verbal abuse in 49 in 100 and neglect in 33 in 100. 11
30 places
per district is the size the government's Swadhar Greh scheme sets for a shelter for women in difficult circumstances. We use it for the women's half and follow the same size for the elders' half. 12
What will happen, point by point, once it opens.
The costs in short, and what a gift of each size pays for.
To set it up
₹2–3.5 crore
About 5,000–6,000 square feet, well above the Swadhar Greh space rule, with two separate wings, a doctor's room, a training room, furniture, a kitchen and security. Our own estimate, not counting land.
Per resident, per month
₹15,000–20,000
Includes a nurse on site, a caseworker for the women, and 24-hour security. Our own estimate.
To run it for one year
₹55–75 lakh
30 residents, with a nurse, a caseworker, a cook, cleaners and guards in shifts, plus food, medicines and electricity. Our own estimate.
The hospital matters most but costs the most, so it cannot open first. This is the order we will follow.
These three are our main goal, so fundraising starts here. The shav vahan costs the least and can be running within months. The bus comes next. It can run for years before the hospital opens, and the patient records it builds will help the hospital from its first day.
Both cost far less than the hospital and can open in rented buildings. They do not need to wait for the hospital, so they can start while we raise money for the larger projects.
This comes last because people will live there, so it cannot open and then close. It needs a building, staff around the clock and steady funding. It will open only when all three are in place.
What this page is, and what it is not.
None of these six projects is running today, and the pictures of the bus and the shav vahan are designs. The camps and drives we already run are on our work and events pages, with photos and numbers.
Where a figure comes from a published source, we have linked it. Where it is our own estimate, we have said so. We have not yet asked companies for final price quotes.
A project starts only when the money to set it up and one full year of running costs have both been promised.
Hospitals and government rules use many short forms. Search for one, or read the list.
Short answers. The details are in each project above.
Up to ₹80 crore to build, equip and open, not counting land, and about ₹36 crore a year to run. The design follows the government's Indian Public Health Standards (IPHS 2022) for a 100-bed district hospital.
About 3,600 gaz. Under the UP building bye-laws of 2025, a hospital with more than 50 beds needs a plot of at least 3,000 square metres (about 3,600 gaz) on a road at least 18 metres wide. So we are looking for one plot of 3,600 gaz for the whole hospital.
Everything the National Health Mission lists for a Mobile Medical Unit, plus a portable digital X-ray, a colour Doppler ultrasound, two drip beds and a two-bed ICU built to the AIS-125 ambulance standard. It will cost up to ₹2.45 crore to build and about ₹80 lakh a year to run. Check-ups, tests and medicines will be free.
It will be free for families below the poverty line, for widows and for anyone who cannot pay. Other families will pay only for the diesel. It will also carry unclaimed bodies, with police permission, for their last rites.
Each plate costs us about ₹50 to make. The diner pays ₹1 (for a child) or ₹5 (for an adult), and donations cover the rest. Running the kitchen for a year at 500 plates a day costs about ₹83 lakh.
Not yet. Today the foundation runs camps and drives with volunteers. These six projects are our plan for what comes next.
You can donate to a project, fund a full year of one, or give land, a vehicle or equipment. You can also contact us to partner on a project through CSR.
Government surveys, government rules and published prices. Where a figure is our own estimate, the page says so next to it. All sources were checked in September 2026 and re-checked on 2 October 2026.
Medical bills pushed 5.5 crore Indians into poverty in 2017, 3.8 crore of them because of medicine costs: Public Health Foundation of India study, reported by Business Standard. View source (opens in a new tab)
Out-of-pocket spending was 39.4% of total health spending in 2021-22: National Health Accounts estimates, reported by All India Radio News. View source (opens in a new tab)
16.8% of households faced catastrophic health spending, and 68% of rural health spending is out of pocket: Frontiers in Public Health (2026). View source (opens in a new tab)
Specialist shortage at rural community health centres, March 2023 (Health Dynamics of India 2022-23): ThePrint. View source (opens in a new tab)
Mobile medical unit norms, staffing and the approved yearly running cost (₹24 lakh with a diagnostic van): National Health Mission. View source (opens in a new tab)
Protein deficiency (2017 survey): Observer Research Foundation. View source (opens in a new tab)
Anaemia, stunting and wasting: National Family Health Survey (NFHS-5), 2019–21, Ministry of Health and Family Welfare. View source (opens in a new tab)
Children aged 6 to 17 out of school, estimated from UDISE+ 2024-25 data: Education for All in India. View source (opens in a new tab)
Reading levels in Class 3 and Class 5: Annual Status of Education Report (ASER) 2024, ASER Centre. View source (opens in a new tab)
Older people in India in 2022 and 2050: UNFPA India Ageing Report 2023. View source (opens in a new tab)
Elder abuse in rural and urban areas, including HelpAge India 2018 survey figures: community study published on PubMed Central. View source (opens in a new tab)
Shelter size (30 women per district) and space rules (80 sq ft per resident): Swadhar Greh scheme guidelines, Ministry of Women and Child Development. View source (opens in a new tab)
Cost and size of a 100-bed hospital (₹30–60 crore, 40,000–60,000 sq ft, ₹10–20 crore of equipment): Hoscons hospital setup cost guide. View source (opens in a new tab)
Plot size, road width, FAR, parking and earthquake rules for hospitals: Uttar Pradesh Model Building Construction and Development Bye-laws 2025, published by the Ghaziabad Development Authority. View source (opens in a new tab)
Price, length (11,850 mm) and gross weight (16,200 kg) of the Tata LPO 1618 bus chassis: 91trucks (2026). View source (opens in a new tab)
ICU ventilator and patient monitor prices in India: HospKart (2026). View source (opens in a new tab)
Typical charges for mortuary vans, hearses and cooled vans in India: Swarga Yatraa (2025). View source (opens in a new tab)
Unidentified bodies found in Delhi from 2018 to 2022, from Delhi Police data: ThePrint (August 2022). View source (opens in a new tab)
Force Traveller hearse prices from Delhi builders: SSS India (about ₹23 lakh) and Spencer India Technologies on IndiaMART (about ₹28 lakh). View source (opens in a new tab)
Property and land rates across Ghaziabad, from about ₹2,800 a square foot in Loni to over ₹13,000 in Vaishali and Kaushambi: NoBroker (2026). View source (opens in a new tab)
Shri Annapurna Rasoi plate weight (600 g) and cost (₹22 from the state, ₹8 from the diner): Outlook India. View source (opens in a new tab)
Beds, critical care, tests, oxygen, water, land use, staffing and nurse ratios for a 100-bed district hospital: Indian Public Health Standards (IPHS) 2022, Volume I, Ministry of Health and Family Welfare. View source (opens in a new tab)
Mortuary cold box prices (about ₹45,000 to ₹1.4 lakh): IndiaMART listings. View source (opens in a new tab)
Ghaziabad lies in seismic zone IV: District Disaster Management, Ghaziabad. View source (opens in a new tab)
Karnataka State Road Transport Corporation's five-bed ICU bus, built in-house for about ₹10 lakh: Deccan Herald. View source (opens in a new tab)
Team, visit schedule, services, tests, equipment, X-ray advice and the ₹18.6 lakh yearly cost of a one-vehicle unit: National Health Mission, Operational Guidelines for Mobile Medical Units. View source (opens in a new tab)
Road ambulance standard, including Type D (advanced life support), interior lining, air conditioning and stretcher tests: AIS-125 (Part 1), Ministry of Road Transport and Highways, 2014. View source (opens in a new tab)
One FoSTaC-trained food safety supervisor for every 25 food handlers: FSSAI, FoSTaC. View source (opens in a new tab)
Daily protein need of Indian adults (0.83 g per kg; 54 g for a man, 46 g for a woman): ICMR-NIN, Nutrient Requirements for Indians, 2020. View source (opens in a new tab)
Madhya Pradesh Deendayal Rasoi: ₹5 plate of 4 rotis, sabzi and dal, with a ₹10 state grant: Deccan Herald. View source (opens in a new tab)
Fire rules for hospitals (Group C-1): fire walls and fire doors for moving patients, stair and door widths, travel distance, fire-fighting kit and fire water for buildings 15 to 24 metres tall: National Building Code of India 2016, Part 4, Fire and Life Safety, clause 6.3 and Table 7, Bureau of Indian Standards. View source (opens in a new tab)
Toilets, baths, wash basins, bedpan sinks and cleaners’ sinks for hospital wards: National Building Code of India 2016, Volume 2, Part 9, Plumbing Services, Bureau of Indian Standards. View source (opens in a new tab)
You can fund a whole project, pay for one year of it, or give land, a vehicle or equipment.